Green Energy

Tata Power Solar Launches Rooftop Solar Solutions in Pink City Jaipur

After the successful launch of residential rooftop solution in Delhi, Mumbai, Bhubaneswar, Bengaluru, Chennai, Guwahati, Jamshedpur and Kolkata, Tata Power has launched its rooftop solar solutions in the pink city of Rajasthan-Jaipur. The event was inaugurated by Mr. Suman Chandrawat, Sr. Sales Manager, Tata Steel, Mr. Surya Prakash Chandak, Director of Center for Development Communication.

Tata power has been launching its services in many Indian cities as the company believes that the  demand for such products would grow with rising environmental awareness. Residential rooftop solar solutions could typically save up to Rs 50,000 annually for 25 years, company officials said.

A votary of reducing carbon footprint, Tata Power Solar’s residential rooftop solution decreases use of diesel generators, hence leading to more fuel savings. Apart from this, the consumers can avail a chance to earn from their idle rooftop space. To further, ease the beneficiaries’ expenses, the proposition comes with government subsidy.

Rajasthan which gets over 3000 hours of sun annually, makes solar installations a clever business move as the summers are just around the corner for northern India. With temperatures scorching in the 40-degree range and above, the rise in electricity demand can very well be met by Solar solutions. The total installed power capacity of Rajasthan is around 21.6 GW, out of which 34% comes from renewable sources. The state plans to further increase solar and wind generation capacity to 14.3 GW by 2022. Its current Renewable purchase obligation for financial year 2018-19 stands at 4.75 % from the earlier 6.75%.

Tata Power Solar already has a successful background of executing World’s largest Rooftop at a single location and India’s largest carport at Cochin International Airport. Recently, Tata Power Solar joined hands with Cricket Club of India and installed the World’s largest solar-powered Cricket Stadium Mumbai, in a record period of 100 days.

Published with permission from Saur Energy

I am Renew

Recent Posts

Delhi’s Winter Pollution Plan Goes Permanent — Here’s What Changes From November 1

Delhi's winter pollution problem has a new answer: a plan that doesn't need to be…

15 hours ago

IFAT India 2026 advances technology and partnerships for India’s water and waste infrastructure

IFAT India 2026 concluded at the Bombay Exhibition Centre in Mumbai after bringing together 20,118…

17 hours ago

UltraTech Powers First Integrated Unit With 100% Green Energy

Indian cement company UltraTech Cement Limited has enabled its integrated cement manufacturing unit, Kukurdih Cement…

2 days ago

India’s SAF Mandate Gains Momentum; Global Industry to Gather at 2nd India SAF Conclave & Awards 2026

Following the Government of India's recent indication that the country's Sustainable Aviation Fuel (SAF) mandate…

6 days ago

GOBARdhan 2.0: Can India turn waste into a new energy revolution?

India’s clean-energy story is entering a new chapter—one that begins not in sprawling solar parks…

1 week ago

UK CBAM To Recognise India’s CCTS Carbon Price From 2027

The UK Treasury has confirmed to India's Bureau of Energy Efficiency that the Carbon Credit…

1 week ago