Green Energy

Public-opposed 30MW Bawana waste-to-energy projects gets green clearance

North Delhi’s Bawana is set to get a new 30MW waste-to-energy (WTE) plant after the Union Ministry of Environment, Forest and Climate Change (MoEFCC) granted it environmental clearance. However, the project continues to face stiff resistance from local residents, who have been opposing it since last year.

Details of the environmental clearance have been published on the Delhi Pollution Control Committee (DPCC) website. The plant will be developed in the DSIIDC Industrial Area of Bawana by M/s Jindal Urban Waste Management (Bawana) Limited, on a 15-acre plot allocated by the Municipal Corporation of Delhi (MCD).

As per the approved proposal, the facility will process around 3,000 tonnes of waste per day, making it the fifth such WTE plant in the national capital. Delhi currently produces over 11,300 tonnes of waste daily, of which approximately 8,100 tonnes are processed through segregation and existing WTE facilities. The remaining waste ends up in overburdened landfills.

Delhi’s existing WTE plants include facilities at Bawana (2,000 TPD), Tehkhand (2,000 TPD), Okhla (1,950 TPD), and Ghazipur (1,300 TPD). The upcoming Bawana plant is expected to serve a 12-kilometre radius, further reducing landfill pressure through incineration of municipal solid waste.

The project is estimated to cost ₹660 crore, with ₹91.6 crore allocated specifically for environmental protection initiatives. An additional ₹14.1 crore has been set aside as an annual recurring expense for ongoing environmental safeguards. Six acres of the site have been earmarked for green belt development.

The clearance report acknowledges the proximity of slum areas and villages to the proposed site. The plant is projected to produce around 357 tonnes of leachate daily, which will be treated at the site through designated facilities. A natural nallah runs through the site, and the Western Yamuna Canal is just 32 metres away. To mitigate environmental risks, measures such as enclosed waste storage pits, and isolated provisions for fly ash and fuel oil have been proposed to prevent contamination.

Despite official clearance, local opposition remains strong. At a public hearing conducted by the DPCC in December last year, residents from nearby villages voiced serious concerns about potential air pollution and health hazards due to toxic emissions. The hearing received 680 objections and suggestions, most urging the relocation of the plant to a less densely populated area.

The conflict between infrastructure development and environmental and public health concerns continues to shape the future of this contentious project.

Recently, the Nomura Research held that Delhi’s pollution could be alleviated by  waste to energy projects including the biogas.

Subhash Yadav

Recent Posts

Punjab’s 90% Drop in Farm Fires May Be a Trick of the Satellite’s Clock

Every winter for the past several years, Punjab's government has pointed to one number: farm…

41 minutes ago

Delhi’s Winter Pollution Plan Goes Permanent — Here’s What Changes From November 1

Delhi's winter pollution problem has a new answer: a plan that doesn't need to be…

24 hours ago

IFAT India 2026 advances technology and partnerships for India’s water and waste infrastructure

IFAT India 2026 concluded at the Bombay Exhibition Centre in Mumbai after bringing together 20,118…

1 day ago

UltraTech Powers First Integrated Unit With 100% Green Energy

Indian cement company UltraTech Cement Limited has enabled its integrated cement manufacturing unit, Kukurdih Cement…

2 days ago

India’s SAF Mandate Gains Momentum; Global Industry to Gather at 2nd India SAF Conclave & Awards 2026

Following the Government of India's recent indication that the country's Sustainable Aviation Fuel (SAF) mandate…

6 days ago

GOBARdhan 2.0: Can India turn waste into a new energy revolution?

India’s clean-energy story is entering a new chapter—one that begins not in sprawling solar parks…

1 week ago