Green Energy

Tesla Plans to Restarts Solar Panel Business With Rental Plans

Tesla is trying to spark its solar panel business by letting consumers rent rooftop systems rather than buy them. Tesla Inc. CEO Elon Musk announced the offering in a series of tweets.

The company will allow residents of six states to rent solar-power systems starting at USD 50 a month – or USD 65 a month in California – for a small set-up. It has also been reported that the rental plans will not require any upfront installation cost for the consumers or the signing of any long-term contracts.

Musk said consumers can cancel anytime, although the company’s website shows that there’s a USD 1,500 charge to remove panels and restore the roof to its previous condition.

Besides California, rentals will be offered in Arizona, Connecticut, Massachusetts, New Jersey and New Mexico. The new rental systems come in three system sizes to fit most homes and lifestyles at three flat rates:

[related_post]

  • 3.8 kW for USD 65 per month
  • 7.6 kW for USD 130 per month
  • 11.4 kW for USD 195 per month

Electric car maker Tesla bought residential solar installer SolarCity for USD 2.6 billion in 2016 but installations have plunged in recent quarters. Tesla stopped selling systems in Home Depot stores.

Tesla estimates that the 3.8 kW system will save homeowners USD 250–650 per year after paying the monthly rent to Tesla. The 7.6 kW system is estimated to save USD 500 to USD 1,300 and the 11.4 kW system is estimated to save USD 750 to USD 1,950 per month after paying the solar system rental fee.

Earlier this month, we reported that to match global demand for massive battery storage projects like Hornsdale, Tesla has designed and engineered a new battery product specifically for utility-scale projects: Megapack.

Megapack significantly reduces the complexity of large-scale battery storage and provides an easy installation and connection process. Using Megapack, any company can deploy an emissions-free 250 MW, 1 GWh power plant in less than three months on a three-acre footprint – four times faster than a traditional fossil fuel power plant of that size. Megapack can also be DC-connected directly to solar, creating seamless renewable energy plants.

Published with permission from Saur Energy

I am Renew

Recent Posts

BPCL commissions 2G ethanol project in Bargarh

Bharat Petroleum Corporation Limited (BPCL) has commissioned a cutting-edge second-generation (2G) bioethanol refinery in Bargarh,…

5 days ago

GUJARAT: 10 bio-CNG plants to power Anand villages to beat LPG shortages

In response to restrictions on commercial LPG cylinders, villages in Gujarat’s Anand district are embracing…

5 days ago

IBA recommends 20% CBG blending for clean mobility in Delhi

The Indian Biogas Association (IBA) has recommended that the Delhi Government consider blending up to…

5 days ago

Solar could meet ASEAN’s new power needs at half the cost of gas: Ember study

Global energy think tank Ember has revealed in its new analysis that replacing ASEAN’s planned…

5 days ago

WOTR rejuvenates 147 water structures in rural Rajasthan

The Watershed Organisation Trust (WOTR) has announced to have marked a significant milestone by rejuvenating…

5 days ago

BPCL, Sembcorp joint venture gets 10KTPA green hydrogen contract from Numaligarh Refinery

Bharat Petroleum Corporation Limited (BPCL), a Fortune Global 500 company and a Maharatna PSU, has…

5 days ago