News

India Needs 18GW Hydro Capacity by 2030 to Meet HPO Norms: ICRA

India’s incremental hydro power generation capacity requirement is estimated to be about 18 GW by 2030, which corresponds to a 39 per cent increase over the existing installed hydro base, based on the notified hydro purchase obligation (HPO) norms and trajectory.

“It is however observed that HPO norms have been notified by SERCs in few states only, in line with policy targets. Hence, timeliness as well as consistency in the notification of HPO norms by SERCs in other states and subsequent implementation by the obligated entities remain a key monitorable,” Girishkumar Kadam, Senior Vice President & Co-Group Head – Corporate ratings, ICRA.

Gurgaon-based ICRA Limited, an independent and professional investment information and credit rating agency, said hydro capacity addition in India has remained sluggish with the significant execution challenges as also seen in the incremental capacity addition of about 22 GW between 2000 and 2021, representing CAGR growth of mere 3 per cent in hydro segment.

The share of hydro power in the overall generation capacity has declined considerably over the period, with a significant rise in thermal capacity addition seen in 2005 till 2015 and thereafter in the renewable energy segment.

“With improved tariff competitiveness of solar and wind energy and strong policy focus by the government, share of renewables including solar and wind energy segment is estimated to grow considerably in the energy generation mix, going forward,” ICRA said.

Hydro energy segment is systemically important from the grid perspective so as to meet the flexibility requirements or peaking power supply. The government has outlined policy measures over the last two-year period to promote the investments in hydro power through notification of HPO norms, long term trajectory for HPO as well as tariff rationalization measures.

Hydro power purchase obligation is set at 0.18 per cent for 2021-22 which, in turn, is set to increase upto 2.82 per cent by 2029-30 at national level, as notified by the power ministry.

I am Renew

Recent Posts

MGL to develop 350-TPD compressed biogas (CBG) plant in Mumbai

In a significant push towards sustainable urban infrastructure, Mahanagar Gas Limited (MGL) and the Brihanmumbai…

13 hours ago

St1 Biokraft secures €260 million for biomethane expansion in Europe

Leading Nordic biomethane firm St1 Biokraft has secured a €260 million corporate financing package from…

13 hours ago

FROM PETROL TO PURE ETHANOL: Maruti Suzuki launches India’s first flex-fuel vehicle

Maruti Suzuki has introduced India’s first flex-fuel passenger vehicle, the WagonR flex-fuel, capable of running…

14 hours ago

India’s Carbon Market Needs Predictable Rules To Build Credibility: IEEFA Report

India's emerging carbon credit market will need strong benchmark design, predictable policy signals, and coordinated…

21 hours ago

Gadkari inaugurates 12 TPD CBG plant and R&D facility of Raj Process at Khandala

Raj Clean Energy Pvt. Ltd., a subsidiary of Raj Process Equipments & Systems, marked a…

1 day ago

HPCL vows to develop 10 CBG projects in Punjab: CM Bhagwant Mann

Punjab Chief Minister Bhagwant Singh Mann has claimed that the Centre owned PSU Hindustan Petroleum…

1 day ago