News

Electrolyser Supply Crunch Hangs Over India’s Hydrogen Ambitions

A global supply crunch of electrolysers needed to produce green hydrogen and a lack of domestic manufacturers to make them pose a major challenge to India’s ambitious targets to use the zero-carbon fuel, as per recent media reports.

India, which unveiled the first phase of its hydrogen policy on Thursday, plans to manufacture 5 million tonnes of green hydrogen per year by 2030, half of the European Union’s 2030 target of 10 million tonnes.

Green hydrogen has the best environmental credentials of the various categories of the clean-burning fuel because it is produced using renewable energy.

For India, it is critical to its plans to cut carbon emissions, but its green hydrogen target would require at least 10 gigawatts (GW) of electrolyser capacity to split water into hydrogen and oxygen.

“The kind of electrolyser capacity that will be required to realise all these ambitious programmes, they are not available right now in the country,” S. S. V. Ramakumar, a director at the country’s top refiner Indian Oil who helped to frame the country’s hydrogen policy, told a news agency.

“All the production capacity and order books of big global players are booked and overflowing till 2025,” he said.

India will initially import electrolysers, he said adding that state-run refiners planned to form joint ventures with foreign companies manufacturing the equipment.

Power Minister R K Singh said in September India would need at least 10 GW of electrolyser capacity. Global electrolyser capacity was 0.3 GW in 2020, and is expected to reach nearly 17 GW by 2026, an International Energy Agency (IEA) report found in December 2021.

Indian billionaire Mukesh Ambani-owned Reliance Industries has said it plans to build an electrolyser unit in western Gujarat state, but it is unclear when the unit will start commercial production.

India expects initial demand to mainly come from refiners and fertiliser firms, followed by the steel industry and transport. India’s refineries are expected to produce 38,000 tonnes of green hydrogen by 2025, Ramakumar said.

I am Renew

Recent Posts

KIS Group, Toyota Tsusho form JV for biogas in Indonesia

The KIS Group has announced that its Indonesian subsidiary PT KIS Biofuels Indonesia (KBI) has…

18 hours ago

JC Global raises Rs 90 crores for plastics recycling in India

Tamil Nadu-based plastics recycler Jayachandran Global Refineries Pvt Ltd (JC Global) has raised $9.5 million…

18 hours ago

MADHYA PRADESH: SunBridge starts commercial ethanol production at Seoni

SunBridge BioEnergy Ltd, the bioenergy arm of Noida headquartered SunBridge Group, has commenced commercial production…

18 hours ago

Steamhouse India plans new waste-to-energy projects, capacity expansion

Surat based Steamhouse India has announced in mandatory filing that the company is expanding its…

18 hours ago

CIP invests in Via Verde having 20 biomethane projects in Italy

Copenhagen Infrastructure Partners (CIP), through its Advanced Bioenergy Fund II (ABF II), has reached final…

18 hours ago

Climate Damage Is ‘Locked In’. The Bill for Carbon Is Rising Faster Than India’s Price for It.

Past emissions have already locked in a measure of future climate damage, but how much…

1 day ago