Green Energy

India’s nuclear power capacity to rise by 70% in the next 5 years: Dr. Jitendra Singh

Union Minister for Science and Technology Dr. Jitendra Singh has said that India’s nuclear power generation capacity is to increase by around 70 per cent in the next 5 years. He revealed it while convening a high-level meeting to review the 100 days Action Plan of the Department of Atomic Energy.

Highlighting India’s progress in nuclear energy and renewable energy in the energy landscape, Dr Jitendra Singh said “Installed capacity of 7.48 GWe will become 13.08 GWe by 2029, which is over 70 percent increase with addition of 7 new reactors. He also took stock of the already operational projects and gave directions for upcoming plans.

Dr. Jitendra Singh directed the department to integrate and collaborate to harness full potential, by capacity building and sharing of knowledge, resources and expertise. The Minister emphasized on indigenous development of technology. He said, “Indigenous technology development and promoting energy security should be our priority.”

He recalled that the government has allowed Joint Ventures with public sector units, increasing budget through collaboration, use of next generation technologies, and increasing cooperation. Speaking on the ease of doing research and scaling up activities he said we are giving single point approval to promote ease of science and promote ease of living for citizens by application of nuclear technology.

Dr. Jitendra Singh informed that the department is suitably designing the 220MW Pressurized Heavy Water Reactor (PHWR) to use a Bharat Small Reactor (BSR) for captive nuclear power generation. He also informed that DAE is also working on Bharat Small Modular Reactor (BSMR) 220 MW to use light water-based reactors by replacing Calandria by pressure vessel.

According to Dr, Jitendra Singh, BHAVINI, a public sector undertaking is in progress to complete initial fuel loading of Prototype Fast Breeder reactor and its 1st approach to criticality is expected in the coming months. This is the 1st fast breeder reactor to produce more fuel than it consumes.

Subhash Yadav

Recent Posts

Kirloskar Pneumatic unveils ‘Tonalli’ waste-to-biogas solution

Kirloskar Pneumatic has unveiled ‘Tonalli,’ a decentralized waste-to-energy solution designed to convert organic waste into…

2 weeks ago

Emrock Corporation clears Rs 33-crore bio-CNG project

Ahmedabad-based infrastructure and construction company Emrock Corporation has said that its subsidiary, Emrock Energy Pvt…

2 weeks ago

India notifies new standards for 30% ethanol blending in petrol

Amid rising global energy concerns, the Union government has introduced new fuel standards permitting ethanol…

2 weeks ago

Anaergia gets C$58 million order from Neogenyx Fuels

Anaergia Inc, through its subsidiary Anaergia Technologies, has entered into a C$58 million contract with…

2 weeks ago

WEST ASIA: Priya Blue Group joins ASRY to build largest ship recycling in Bahrain

Priya Blue Group, one of South Asia’s leading environmentally responsible ship recyclers, has partnered with…

2 weeks ago

Bhutan begins construction of 25-MW Begana hydropower

Bhutan has officially begun construction of the 25-megawatt Begana Integrated Multipurpose Small Hydropower Project, marking…

2 weeks ago