Green Energy

Hygenco Delivers Green Hydrogen Demonstration Project in Ujjain

Aiming to be a global leader in deploying Green Hydrogen and facilitating industry solutions, Gurugram- based Hygenco, has installed what it claims is India’s first-of-its-kind off-grid solar PV based green hydrogen pilot plant in Madhya Pradesh. Hygenco says this green hydrogen pilot plant is 100% green by being fully independent of grid ( or backed by fossil power)

Located in Ujjain District (around 60 km from Ujjain), the pilot plant commenced trial operations on March 31, 2022 and was fully commissioned by April 15, 2022. Hygenco is harnessing the renewable power rich location for solar as well as wind-based power generation.

“We are proud to install India’s first truly green hydrogen plant and be a part of India’s mission to produce five million tonnes of green hydrogen annually by 2030. This pilot plant will be part of our R&D Center of Excellence in hydrogen technologies,” said Amit Bansal, Co-Founder & CEO, Hygenco. He added that ‘We hope to provide clean and affordable hydrogen for end-use industries in the country and facilitate in their journey to decarbonise operations”

A state-of-the-art and fully autonomous plant, Hygenco’s green hydrogen pilot plant is controlled by an advanced Energy Management and Control System. The EMCS monitors hundreds of parameters such as solar PV generation, state of charge, as well as hydrogen generation, pressure, temperature, purities from electrolyser and makes autonomous real-time decisions to achieve high efficiencies. The technology enables Hygenco to augment the hydrogen yield and deliver cost-competitive hydrogen to the end clients.

The green hydrogen space, which has seen a flurry of announcements ever since the National Hydrogen Mission was announced, is set to see a huge rise in investments in the coming months and years, as India pushes to become a green hydrogen hub. Currently, the country has set a goal of 5 million tonnes production by 2030.  There is talk of a Green Hydrogen Purchase Obligation being introduced at some stage, besides other measures to support production. The key challenge of course is to bring down production costs to  a dollar per k.g.

 

Prasanna Singh

Prasanna Singh is the founder at IamRenew

Recent Posts

Madurai corp to develop waste-to-energy plant at Vellaikal dump yard

In a significant step towards strengthening solid waste management, the Madurai City Corporation is set…

3 days ago

ANDHRA PRADESH: Two new ethanol projects get environmental clearance

Two ethanol production projects proposed in the Kodavalur mandal of Andhra Pradesh have received mandatory…

3 days ago

Patrizia secures €175 million for waste-to-energy platform Saren

PATRIZIA, an investment manager in global real assets, has secured EUR 175 million in new…

3 days ago

Syzygy Plasmonics, Geo Bio Gas&Carbon to develop SAF from Brazilian biogas

Houston based Syzygy Plasmonics has signed an MOU with ‘Geo bio gas&carbon’ - Brazil's foremost…

3 days ago

Govt procurement vital for speeding up India’s ‘Green Steel’ transition: CII Study

A new study by the Confederation of Indian Industry (CII)–Green Business Centre, supported by Climate…

3 days ago

DELHI: MCD, NDDB plan 10 biogas plants to make dairies ‘sustainable’

The Municipal Corporation of Delhi (MCD) has drawn up an ambitious action plan to check…

5 days ago