Green Energy

India’s nuclear power capacity to rise by 70% in the next 5 years: Dr. Jitendra Singh

Union Minister for Science and Technology Dr. Jitendra Singh has said that India’s nuclear power generation capacity is to increase by around 70 per cent in the next 5 years. He revealed it while convening a high-level meeting to review the 100 days Action Plan of the Department of Atomic Energy.

Highlighting India’s progress in nuclear energy and renewable energy in the energy landscape, Dr Jitendra Singh said “Installed capacity of 7.48 GWe will become 13.08 GWe by 2029, which is over 70 percent increase with addition of 7 new reactors. He also took stock of the already operational projects and gave directions for upcoming plans.

Dr. Jitendra Singh directed the department to integrate and collaborate to harness full potential, by capacity building and sharing of knowledge, resources and expertise. The Minister emphasized on indigenous development of technology. He said, “Indigenous technology development and promoting energy security should be our priority.”

He recalled that the government has allowed Joint Ventures with public sector units, increasing budget through collaboration, use of next generation technologies, and increasing cooperation. Speaking on the ease of doing research and scaling up activities he said we are giving single point approval to promote ease of science and promote ease of living for citizens by application of nuclear technology.

Dr. Jitendra Singh informed that the department is suitably designing the 220MW Pressurized Heavy Water Reactor (PHWR) to use a Bharat Small Reactor (BSR) for captive nuclear power generation. He also informed that DAE is also working on Bharat Small Modular Reactor (BSMR) 220 MW to use light water-based reactors by replacing Calandria by pressure vessel.

According to Dr, Jitendra Singh, BHAVINI, a public sector undertaking is in progress to complete initial fuel loading of Prototype Fast Breeder reactor and its 1st approach to criticality is expected in the coming months. This is the 1st fast breeder reactor to produce more fuel than it consumes.

Subhash Yadav

Recent Posts

India producing 920 TPD biogas with 132 CBG plants: Hardeep Singh Puri

In a major revelation, Union Minister Hardeep Singh Puri has stated that India has commissioned…

1 day ago

HPCL sets-up SAF plant at Visakh Refinery

India’s energy major Hindustan Petroleum Corporation Limited (HPCL) has commissioned a Sustainable Aviation Fuel (SAF)…

1 day ago

ViGo Bioenergy acquires Drive Systems to build largest LNG network in Belgium

Currently, Drive Systems operates five high-quality stations across Flanders, servicing key transport routes through Antwerp…

1 day ago

EU imposes Carbon Border Tax raising costs for exporters

The Carbon Border Adjustment Mechanism (CBAM) of the European Union (EU) has come into effect…

1 day ago

RCT Hydrogen to launch 250 MW electrolyzer manufacturing from 2026

In a key development, RCT GH GmbH (RCT Hydrogen), a German manufacturer of hydrogen production…

1 day ago

Novel co-pyrolysis of biomass & plastic to produce green fuel

A scientific study has highlighted the potential of co-pyrolysing biomass and polypropylene plastic to produce…

1 day ago