Green Energy

India’s nuclear power capacity to rise by 70% in the next 5 years: Dr. Jitendra Singh

Union Minister for Science and Technology Dr. Jitendra Singh has said that India’s nuclear power generation capacity is to increase by around 70 per cent in the next 5 years. He revealed it while convening a high-level meeting to review the 100 days Action Plan of the Department of Atomic Energy.

Highlighting India’s progress in nuclear energy and renewable energy in the energy landscape, Dr Jitendra Singh said “Installed capacity of 7.48 GWe will become 13.08 GWe by 2029, which is over 70 percent increase with addition of 7 new reactors. He also took stock of the already operational projects and gave directions for upcoming plans.

Dr. Jitendra Singh directed the department to integrate and collaborate to harness full potential, by capacity building and sharing of knowledge, resources and expertise. The Minister emphasized on indigenous development of technology. He said, “Indigenous technology development and promoting energy security should be our priority.”

He recalled that the government has allowed Joint Ventures with public sector units, increasing budget through collaboration, use of next generation technologies, and increasing cooperation. Speaking on the ease of doing research and scaling up activities he said we are giving single point approval to promote ease of science and promote ease of living for citizens by application of nuclear technology.

Dr. Jitendra Singh informed that the department is suitably designing the 220MW Pressurized Heavy Water Reactor (PHWR) to use a Bharat Small Reactor (BSR) for captive nuclear power generation. He also informed that DAE is also working on Bharat Small Modular Reactor (BSMR) 220 MW to use light water-based reactors by replacing Calandria by pressure vessel.

According to Dr, Jitendra Singh, BHAVINI, a public sector undertaking is in progress to complete initial fuel loading of Prototype Fast Breeder reactor and its 1st approach to criticality is expected in the coming months. This is the 1st fast breeder reactor to produce more fuel than it consumes.

Subhash Yadav

Recent Posts

Andhra Pradesh gears up for two new waste-to-energy projects

In a significant move to strengthen waste management and promote renewable energy in the Rayalaseema…

4 days ago

EBP paid Rs 1.43 lakh cr to farmers; Grain based ethanol find centre-stage: Suresh Gopi in Parliament

India’s Ethanol Blended Petrol (EBP) programme has delivered substantial financial and environmental gains, with payments…

4 days ago

PFC and MECON collaborate for green hydrogen, clean energy

Government-owned power sector lender Power Finance Corporation (PFC) has entered into an MoU with engineering…

4 days ago

Panipat CBG Project: GPS Renewables delivers 100% capacity in record 103 days!

In a significant boost to India’s compressed biogas (CBG) sector, Bengaluru based conglomerate GPS Renewables…

4 days ago

GORAKHPUR: Pipraich Sugar Mill mulls ethanol production

The Pipraich Sugar Mill in Gorakhpur district, owned by Uttar Pradesh State Sugar Corporation Ltd,…

4 days ago

EOIs invited for skill development under ‘Jaiv Urja Mitra’ scheme

The Sardar Swaran Singh National Institute of Bioenergy (SSS-NIBE) has invited Expressions of Interest (EOI)…

4 days ago